soulintec-metering-skid

Installation and commissioning of 4 metering lines at Total Suez

Total Egypt

15th of February 2018

During this project we installed, commissioned and started up 4 metering lines at Total Suez. Our scope of work was in 2 main fields, electrical installation works and mechanical modification works

The electrical installation works included installing the EX junction boxes (for both the metering line and the UPS), the cable trays, conduits, armored power cables (supply, laying and termination), armored signal cables (Supply, laying and termination), EX glands, metal glands, Ex stoppers and EX reducers. Then the commissioning and start up of the 4 metering lines

The mechanical modification scope of work included as- built drawings for the metering skids, supply and installation of metering piping, on/ off valves and the installation and testing of all the above mechanical activities.