Supply, Upgrade and Commissioning of a PLC panel for six new silos, ACICO, Kuwait
To accommodate instrumentation and control signals at a new cement silo at the Shuaiba plant, Soulintec engineered a PLC I/O panel and modified the existing PLC program and SCADA GUIs.
The first part of the project included instrumentation, control engineering and supervising the installation. Soulintec provided the following:
- Instrument cable design, selection, route selection and installation
- Wiring diagram review and cable termination between the instrument and control panel
- Loop checking all the instrument cables
- As- built drawing implementation assistance
- Glands and junction boxes selection
The second part was the supply of the silo’s control system, here Soulintec’s scope of work was:
- Supply of the I/O panel with ProfiNet interface
- Supply of the new S7 400 PLC and S7 300 PLC with ProfiNet communication for the existing mills and establish communications between both PLCs and the new I/O panel
- PLC program modifications and WinCC SCADA GUI modifications. Establish redundancy between both WinCC workstations
- Loop testing, commissioning and startup of the system
- Technical support including visits and remote support