Modifying a tank to connect it to the existing blending system

Client: Exxon Mobil Asher

The 24th of March 2015

Certain modifications were required to be made on a tank in order to be able to connect it to the existing blending system. These modifications mostly included installing instrumentation.

Our scope of work included:

  • The supply of RTDs complete with temperature transmitters and thermo wells
  • Supply of vibrating fork level switches
  • Supply of temperature controllers
  • Supply and installation of cables from the control room to the tank including control and power cables, cable trays, and instrument tubing and fitting
  • Installing the Pulse Air Controller
  • Panels wiring